Great followup Fei. Learnings for eToolLCD users from this:
1) Internal finishes of external walls is in scope (makes sense as the wall system in it’s entirely should be assessed for a fair comparison)
2) There’s flexibility in the scope in general if the intent of the LCA is upheld (and the proposed scope is justified