Motivation (why we need this feature): Correct reporting of emissions between modules and increased user flexibility to assign these. , Which regions need the feature?: Global, Which projects types does the feature support?: Buildings, Infrastructure, Fit Outs, Landscaping, Which ratings systems require the feature?: Not rating system specific.,
Emissions from temporary materials should be accounted for in module A5, rather than A1-3.
definitely needed in some form