2
In “part new – part refurbishment” projects and depending on the methodology(e.g. RICS) the refurbished part of the building might need to be modelled including the existing structure so that Stage B impacts onward will be calculated. To address that, it would be good to be able to set the LC modules in “Structure” level so that the new build and refurb parts will be modelled as separate structures and with their own modules on.