Enable Longer Scenario Chains/Branches

3
2 years agoopen0
Motivation (why we need this feature): Avoid additional certification steps., Which regions need the feature?: Global, Which projects types does the feature support?: Buildings, Infrastructure, Fit Outs, Landscaping, Other, Which ratings systems require the feature?: N/A,

As a user, for the times when I need to update an already certified Proposed Design, it would be very convenient if I’m able to create another long scenario branch off an existing one so that I can avoid creating a whole new scenario tree with a new Reference & Proposed Design that both need to get recertified.

Leave A Comment?

You must be logged in to post a comment.