2
File Motivation (why we need this feature): Scaling of costs for each template gives more accurate scaling of costs in a design, though can be very time consuming. , Which regions need the feature?: Global, Which projects types does the feature support?: Buildings, Infrastructure, Fit Outs, Which ratings systems require the feature?: LCC reporting for Breeam.,
Scale costs in design to cost plan accurately and quickly.
Related Ideas
Add template to all scenario options
open6 months agoAs a user there are often times when a material template was missed or added into a design after various scenarios have already been made. Adding a 'A...Read more
Simultaneous Scenarios and Recommendations within a Structure
open3 years agoI would like to be able to use the scenarios function for a new design in an existing structure without affecting recommendations already recorded for...Read more
InfoGraphics (Environ. Sustainability Scale & GHGs avoided)
open3 years agoWhen InfoGraphics are generated not apparent improvement is show in comparison to the selected benchmark and therefore no model is assigned to the &qu...Read more