Project and Structure Level reporting

5
10 months agoopen0
Reporting Motivation (why we need this feature): An increasing number of precinct level projects are motivated to use LCA to understand their overall impact, but modelling an entire precinct in a single model is often impractical - particularly when RapidLCA can be used for a portion of the project. It makes more sense to model precincts as multiple structures within a single project and then generate a summary report at the project or structure level to understand the overall performance of the project., Which regions need the feature?: Global, Which projects types does the feature support?: Buildings, Infrastructure, Other, Which ratings systems require the feature?: Nill - possibly required for Witchcliffe Eco Village,

For large projects involving multiple buildings (such as precinct level projects) it would be very useful to be able to create reports at the structure, or project level.

Precinct level projects containing multiple buildings will often only be practical to model using multiple structures or multiple different building models per structure (or a combination of both). It would be very useful to be able to create summary reports at the structure and project levels that consolidate the performance of each of the individual models to report the overall performance of the project.

When generating a report at the project or structure level, users would select which designs to include in the report with the option for selecting a benchmark or reference for each.

The summary report (similar to the exec summary in the current LCA/LCD reports) would provide total impacts for the entire project along with the summary performance of the individual designs selected (compared to their benchmarks, if selected).

An option to include the LCA reports for each design as appendices to the summary report would also be useful.