Scope 1, 2 and 3 – Sort Analysis

2
9 months agoopen0
Design OptimisationReporting Motivation (why we need this feature): Reduce error, streamline analysis process, user friendly interface, Which regions need the feature?: Global, Which projects types does the feature support?: Buildings, Infrastructure, Fit Outs, Landscaping, Other, Which ratings systems require the feature?: N/a,

In the Analysis tab for a scenario, it would be extremely helpful to be able to sort by Scope 1, 2 and 3 for the design (similar to how you can select element process names or modules). A one-click tab would eliminate the need for manually grouping all impacts for Scopes 1, 2 and 3 and eliminate error.

Leave A Comment?

You must be logged in to post a comment.