3
Allow a design to be un-certified and re-certified. This might be needed if a new certification requirement arises (such as if a new rating scheme is being applied that requires additional certification checks), or if changes need to be made post-certification.
OR
Unlock a certified design for changes, warn users this will:
- Watermark existing saved reports
- Track changes to a design when unlocked
- Add a “Changes since review” section to reports generated moving forward with list of changes so audience of the report understands the models have been edited since the certification
- Allow “Update Certification” option to send the design back through the certification process